Integrated Fire Water Tanks for Chemical Plant Safety

 

 

Project Introduction

 

This project supplied two large vertical fire water tanks for the new plant of Jiangsu Changshu Baolifeimu Co., Ltd., forming the reliable water source foundation for the plant's automatic fire protection system and ensuring safety for the chemical enterprise.

Location: Changshu, Jiangsu, China
Client: Jiangsu Changshu Baolifeimu Co., Ltd.
Project Value: $200,000 USD
Completion Time: 60 Days
page-1200-1000

 

Cooperation Process & Challenge

 

The project proceeded concurrently with the plant construction. We flexibly adjusted the construction schedule and coordinated with other contractors (e.g., civil works) to ensure smooth integration of the water tank system with the overall fire network, delivering it within 60 days.

 

Technical Advantages

 

The tanks are intelligently integrated with fire pumps and control systems, allowing for remote monitoring and automatic activation for rapid response.

page-1200-900

 

Our Solution

 

We provided a fully integrated solution. The tanks were equipped for smart linkage with fire pumps and the plant's control system, enabling remote monitoring and automatic activation. Our team maintained flexible scheduling to coordinate perfectly with civil and network contractors.

 

The Result

 

The tanks were delivered within the 60-day schedule, providing Baolifeimu with a reliable, automated water source that forms the backbone of their plant's life-safety system.

page-1200-1000

 

After-Sales Service

 

We provide periodic testing services for the integrated fire system functions.
Key Specifications:
Capacity: 2 x ~600 m³
Feature: Intelligent System Integration
Benefit: Automated, Rapid Response

 

Product Specification Table

 

Product Attribute

Specifications

Product Specification

~600 m³ (per unit), Ø8m x H10.5m

Product Material

Q235B Carbon Steel

Product Application

Water Storage for Pressure Stabilization in Chemical Plant Fire Systems