Zhongneng Huajian Expands Overseas Installation Teams For Middle East And Africa, Cutting Tank Erection Time By 30 Percent

Sep 24, 2026

Leave a message

A tank that ships perfectly can still fail on site if the erection crew is untrained. Zhongneng Huajian has expanded its overseas installation teams-welding supervisors, NDT technicians, coating inspectors and rigging specialists-to cover the Middle East and Africa with standardized procedures that cut erection time by roughly 30 percent compared with a crew learning the job on the spot.

What the overseas team brings

Welding supervisors qualified to NB/T 47014 (equiv. ASME Sec. IX) with English-language WPS packs

NDT technicians certified to ISO 9712 for RT, UT, MT, PT

Coating inspectors trained to NACE/SSPC level, with DFT and holiday test instruments

Rigging specialists for shell course jacking, roof lifting and large-diameter tank assembly

A site QC engineer who keeps the inspection dossier in the same format as the shop MDR

Standardized erection procedure

ZN's overseas erection manual covers: foundation acceptance, shell course layout, jacking sequence, weld map, NDT hold points, coating DFT check, hydrotest procedure, settlement observation and handover. The crew follows the same steps whether the tank is in Dammam or Lagos, so the owner gets the same quality language even if the local labor pool changes.

Time saving that matters

A 2,000 m³ vertical tank typically takes 45–60 days on site with a crew learning the job. ZN's trained team completes the same tank in 30–40 days, because shell course fit-up, welding sequence and NDT hold points are pre-planned rather than improvised. For a 10-tank depot, that is 3–4 months of schedule compression.

Deployment model

Option A: ZN sends a full crew (supervisor + welders + NDT + coating) for the whole erection

Option B: ZN sends a supervisor + QC engineer, and the owner supplies local labor

Option C: ZN sends a commissioning engineer only, for tanks that ship welded-complete

Carbon Steel Vertical Storage Tank

FAQ snippet

"Do overseas crews speak English?" Yes. Site supervisors, QC engineers and NDT technicians all work in English; welding supervisors carry bilingual WPS and daily reports are issued in English. Arabic and French support is available on request for specific regions.

For buyers who want to build local capability, ZN also runs a 2-week erection training course at the Shandong plant, covering shell assembly, welding control, NDT hold points and coating inspection.