Step 1: Site Preparation
Before installation, the site must be prepared carefully.
Key Tasks
- soil investigation
- ground leveling
- foundation construction
A stable foundation is essential for large tanks, especially vertical storage tanks.
Step 2: Foundation Construction
Common foundation types include:
- concrete ring wall foundation
- full concrete slab
- sand cushion foundation
The foundation must support:
- tank weight
- liquid load
- environmental forces
Step 3: Tank Fabrication and Delivery
Storage tanks may be:
- prefabricated (horizontal tanks)
- assembled on-site (large vertical tanks)
Manufacturers such as Zhongneng Huajian Metal Structure provide precision fabrication before delivery.
Step 4: Tank Erection
Vertical Tank Installation
- bottom plate assembly
- shell plate welding
- roof installation
Horizontal Tank Installation
- positioning
- anchoring
- piping connection
Step 5: Welding and Inspection
All welds must undergo strict inspection:
- ultrasonic testing
- radiographic testing
This ensures structural integrity.
Step 6: Anti-Corrosion Treatment
Surface protection includes:
- sandblasting
- painting
- coating
Step 7: Hydrostatic Testing
Before operation, tanks must be tested using water to verify:
- leakage
- structural performance
Conclusion
Proper installation ensures safe and reliable tank operation. Working with experienced EPC contractors reduces risk and improves project quality.