Water tanks are not all the same. A fire water tank sees clean municipal water. A sewage equalization tank sees sulfide, surfactant, pH swings from 2 to 11, and a submersible mixer that shakes the shell like a washing machine. Zhongneng Huajian's product list already includes sewage tanks and fire water tanks; the engineering behind them is very different.
The tannery case
A tannery in Zhejiang ordered a 600 m³ tank that had to do double duty: fire reserve on the top 200 m³, equalized tannery wastewater on the bottom 400 m³. ZN split the duty in the process datasheet rather than the steel:
Lower shell: Q345R carbon steel, internal epoxy phenolic 2-coat system, 400 µm DFT, spark tested at 4 kV
Upper shell: pure epoxy 240 µm, potable-adjacent grade
Mixer nozzle at 1.5 m above bottom: 16 mm reinforcement plate, because vibration fatigue at a cantilevered mixer shaft will crack a bare shell in 18 months
Vent: anti-insect cowl + H2S-rated activated carbon cartridge (owner-supplied), tank roof kept cone type to avoid floating deck in sludge service
Textile and dye wastewater
For a textile park in Shandong, ZN built four 800 m³ equalization tanks with:
Glass-flake vinyl ester patch at splash zone
Removable manhole insert for rag and fiber cleanup
Heating coil option for winter viscosity (some dyes gel at 8 °C)
Level radar with stilling tube to avoid foam false echo
Municipal WWTP process water
Municipal plants often ask for 1,000–3,000 m³ process water or return-activated-sludge buffer tanks. ZN's standard answer: epoxy coal tar inside, aluminum silicate outside if buried, catwalk with non-slip grating, and a 600 mm manhole big enough for a confined-space rescuer with SCBA.
Why lining choice decides tank life
Sewage tanks fail from the inside out. Three recurring causes:
Wrong coating: alkyd paint in H2S service → blisters in 6 months
No cathode path: buried sewage tank without bottom-side protection → underside pitting
Mixer vibration ignored → nozzle weld toe crack
ZN issues a Lining Specification Sheet with every sewage tank: medium pH, TSS, oil & grease %, chloride mg/L, H2S ppm, temperature, and cleaning chemical. The coating supplier is named, not "anti-corrosion paint."

FAQ snippet
"Can one tank store fire water and sewage?" Not in the same compartment. You can have a partitioned tank or a fire-water tank fed by a treated-effluent line, but raw sewage and fire mains must never share a shell for regulatory reasons.
ZN's 600 m³ tannery unit was erected in 20 days including coating cure, because shell courses were pre-blasted in the shop and only the final topcoat was done on site.